27-07-2020, 12:28 PM
(26-07-2020, 06:28 PM)Paplane Wrote:(26-07-2020, 06:25 PM)Redtrev Wrote: When we visited the City Ground to look at the plans for the new stand etc. we were told that the building of the stand was dependent on the apartment blocks being built. i.e no apartments, no stand.
It may be no appartments, no 8k capacity, 3 tiered stand but they could build a replacement modern equivalent for the current main stand for half the price, or less probably.
Theres no point going half measures though as current stand holds 4k. With modern regs, a 4k replacement would be bigger and cost a fortune to build (and demolish old stand). I think PT stand is still the most expensive tickets in the ground (non corporate). So might as well do it properly even its delayed.
